首页 试题详情
单选题

On completion of corrections of all notices from a NM, mark ____on the front cover page of the NM with the same. A. ENTERING B. ENTERED C. COMPLETED D. CORRECTED

Aa

Bb

Cc

Dd

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    On completion of corrections of all notices from a NM, mark ____on the front cover page of the NM with the same.A. ENTERING B. ENTERED C. COMPLETED D. CORRECTED

    答案解析

  • 单选题

    _____are to be carried out on all ships instead of the second or third annual survey within 3 months, before or after either one of the anniversary date, after completion, commissioning or special survey, as appropriate.

    答案解析

  • 单选题

    The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ) .

    答案解析

热门题库